“September 2012 – Kevcon’s Lake Meade North Entrance Station published in the September-October issue of DCD Magazine.”
Check it out here
____________________________________________________________________________________________
May 2012 – Kevcon is pleased to announce that the New Outpatient Specialty Clinic at the VA Medical Center in Vancouver WA has been awarded the prestigious Association of General Contractors’ 2012 Build Washington Award for Best Public Building Under $10M.
____________________________________________________________________________________________
October 2011 – Kevcon, Inc. is proud to announce that it was recognized as the 24th fastest growing company by the San Diego Business Journal in their eighth annual 100 Fastest-Growing Private Companies in San Diego County awards program. This award recognizes San Diego’s top growth companies based on revenue increase over a three-year period. Ranking was determined by the percent of verified revenue growth from 2008 to 2010.
____________________________________________________________________________________________
Recent Project Awards
9-30-2013 – Design/Build Demolish Building 2 and Construct New patient Parking, VA Medical Center Palo Alto, CA
9-30-2013 – Entrance Replacement, Building 7, VA medical Center Spokane, WA
9-12-2013 – Replace Steam and Water Lines, VA medical Center Spokane, WA
9-11-2013 – Infrastructure Upgrades, Phase 1 – Miller Hill Remote Switching Unit (RSU) at Joint Base Ft Lewis McChord, WA
12-26-2012 – X-Ray Electrical Pathways, VA medical Center Spokane, WA
12-11-2012 – Replace Emergency Transfer Switches, VA medical Center Spokane, WA
10-01-2012 – Warehouse Clean Storage, VA medical Center Spokane, WA
9-25-2012 – Building A Communications & Electrical Improvements, San Diego Trolley, San Diego, CA (sub to Southland Electric)
9-19-2012 – Install New Flooring, VA Medical Center El Paso, TX
9-13-2012 – Replace Water Supply Services, VAMC Spokane, WA
9-08-2012 – Montana Air National Guard IDIQ/MATOC (2 year + 3 one year options; $20M) for Maintenance, Repair, Construction and Design-Build at the Montana Air National Guard Base, Great Falls, MT and USPFO-MT, Helena, MT
8-18-2012 – Install New Flooring, VAMC El Paso, TX
8-12-2012 – Replace Committal Shelter Walkways, Eagle Point National Cemetery, Eagle Point, OR
7-18- 2012 – Cemetery Improvements & New Maintenance Building, Ft. Bayard, NM
7-14-2012 – Install Sterilizers, SPD, Building 26 7th Floor, VAMC Long Beach, CA
7-13-2012 – Construct Endoscopy and Central Processing Additions, VAMC Spokane, WA
7-06-2012 – IDIQ/MATOC VISN 18 Phoenix for New Mexico (Albuquerque) and Texas (El Paso and Amarillo), 2 year with options for additional 3 years, $50M maximum
7-06-2012 – Design-Build Repair Steam Infrastructure, VAMC Walla Walla, WA
6-29-2012 – Canteen Renovation, VAMC Reno, NV
6-29-2012 – Construct Access Improvements Traffic Loop, VAMC Roseburg, OR
6-29-2012 – Canteen Renovation at the Phoenix VA Health Care System (PVAHCS) in Phoenix, AZ
6-26-2012 – LTC Greenhouse Addition and Renovation of Building 11 at VAMC Waco, TX
4-03-2012 – Seismic Upgrades and Renovation of Building 2, 3rd Floor (the Canteen and the Eye Clinic), VAMC Tacoma, WA
4-03-2012 – Seismic Upgrades and Renovation of Building 2, 1st and 2nd Floors (Blind Rehabilitation), VAMC Tacoma, WA
1-25-2012 – VISN22 Design-Build MATOC (5 year, 2-1-2012 to 1-31-2017), for VAMCs in Long Beach, Los Angeles, North Hills, Loma Linda, and San Diego, CA
1-11-2012 – Steam Trap Replacement, VA SORCC, White City, OR
12-20-2011 – MRI Installation, VAMC Portland, OR
12-05-2011 – Replace Administration & Maintenance Buildings & Site Improvements, Eagle Point National Cemetery, OR
10-24-2011 – Upgrade Environment Canteen, SORCC White City, OR
10-24-2011 – Replace Carpet Phase 3, SORCC White City, OR