Telecomm Closet Climate Control Upgrade

Location: VA SORCC White City, OR
Owner: Department of Veterans Affairs (VA)

Completion: November 2010
Cost: $296,525.00

This Design-Build project involved preparing site for building operations including demolition and removal of existing structures.  Secured 28 data closets and installed new cooling systems in each telecom closet to keep the electronics at the proper temperature for their optimum efficiency.

“Project Photos Coming Soon”